Posted Fri, 18 Jan 2008 14:31:59 GMT by zheng
Hi,

One question about assigning pumping rate to wells. If I assign a pumping rate of 100 m3/d to slice 2, which layer does it mean that the water is extracted from, layer 1 or layer 2?

Thanks,


Qinghuai
Posted Wed, 23 Jan 2008 14:13:56 GMT by Alexander Renz
The water will be extracted from both layers, depending on their actual conductivity
Posted Sun, 10 Feb 2008 14:42:11 GMT by Denim Umeshkumar Anajwala
hi!
what you are actually determine is the depth of the well screens.
i.e. the z coordinate of slice 2 is the position (depth) where the screens are.

Elad Dafny
Posted Thu, 21 Jul 2022 13:52:04 GMT by Ander Alba
Hi!<br> <br> I have a question in relation with, ¿how can i change the pumping rate? I would like to see the variation of the hidraulic head or the groundwater table with diferent pumpings rates<br> <br> Thanks,&nbsp;<br> <br> Ander

You must be signed in to post in this forum.