Hello Guys,

I am working on calibrating a sewer model. I am calibrating the model for weekdays and weekends and I am using load allocation to introduce/change the loads to the model.

In one of my areas, there is a significant difference between weekdays load and weekends load. I. e. I have 1100 m3/d for weekdays and 490 m3/d for weekends. I tried to take care of this by applying a diurnal pattern to weekend that does not average to 1 and averages to 0.44 (490/1100), while keeping the load 1100 m3/d. However I did not see any change. May you please tell me if there is a way to take care of this in MU?

Thanks