Please wait...
×

Error

Posted Wed, 29 May 2024 21:15:34 GMT by Dipen Saha Graduate Research Assistant
I am facing following problem while simulating 1D river model in MIKE +. How can I change the default value 1 to 100 times to overcome this error in MIKE+? Largest exceedance on reach 'GAUDALUPE_RV', chainage: 3400.00 m. Water depth is 1.3650 m which is more than 1.0000 times the cross section height. Water level is 1.8450 m.
Posted Fri, 31 May 2024 09:51:34 GMT by Dmytro Zubal
Hello, You have to change some of factors on Simulation Tab  in MIKE 1D engine configuration. Set Cross section extrapolation to Value=2, and set Cross section extrapolation height factor to Value=100.
Posted Fri, 07 Jun 2024 16:58:04 GMT by Dipen Saha Graduate Research Assistant
Thank you so much

You must be signed in to post in this forum.