Posted Tue, 11 Sep 2018 06:01:40 GMT by Ming Zhi Wu Postdoctoral Fellow
Is there a way to track the actual pumping rate of a multilayer well during a simulation? I have a model of a construction site undergoing dewatering, and I want to see if the dewatering well turns off as the water level decreases. If you had a well boundary condition at the node, you can track the fluid rate budget during the simulation (using budget history charting). Can you do something similar for multilayer wells?
Thanks.
Posted Fri, 14 Sep 2018 10:52:10 GMT by Hannes Räuschel PhD Student
I would be interested in an answer to that question as well.
Posted Mon, 17 Sep 2018 06:00:40 GMT by Peter Schätzl
For calculation, the multi-layer well is 'translated' into a discrete feature element along the well screen and a well BC on the bottom node. Thus you can track the budget by doing budget history charting on the bottom node.
Posted Fri, 21 Sep 2018 06:41:19 GMT by hanoisss
Thank you for this answer.