Posted 7 years ago by Ming Zhi Wu Postdoctoral Fellow
Is there a way to track the actual pumping rate of a multilayer well during a simulation? I have a model of a construction site undergoing dewatering, and I want to see if the dewatering well turns off as the water level decreases. If you had a well boundary condition at the node, you can track the fluid rate budget during the simulation (using budget history charting). Can you do something similar for multilayer wells?
Thanks.
Posted 7 years ago by Hannes Räuschel PhD Student
I would be interested in an answer to that question as well.
Posted 7 years ago by Peter Schätzl
For calculation, the multi-layer well is 'translated' into a discrete feature element along the well screen and a well BC on the bottom node. Thus you can track the budget by doing budget history charting on the bottom node.
Posted 7 years ago by hanoisss
Thank you for this answer.