Please wait...
×

Error



Posted 8 years ago by Ahrouch Samira
Hello everyone,
i am wondering if the model NAM could be run with "autocalibration" for 1 single storm event or the simulation period must be at least 1year.
thank you
Posted 8 years ago by Ahrouch Samira
the answer is yes. The model can be run with a short simulation period.

You must be signed in to post in this forum.