Posted Mon, 25 Sep 2017 14:49:27 GMT by Ahrouch Samira
Hello everyone,
i am wondering if the model NAM could be run with "autocalibration" for 1 single storm event or the simulation period must be at least 1year.
thank you
Posted Tue, 26 Sep 2017 15:38:38 GMT by Ahrouch Samira
the answer is yes. The model can be run with a short simulation period.

You must be signed in to post in this forum.