• Duration of time-series in Water Hammer Analysis

    Hello,

    I have been setting up a water hammer analysis of an irrigation network in Mike Urban. Everything seems to run normally but despite the fact that my Analysis Duration equals 240 secs, when I open a time series (e.g. link flow or node pressure) the x-axis is displaying values from 0 to 120 secs. This behavior doesn't change even if I change my Junction closure curve in order to last 240 secs. I have also tried altering the Analysis duration without success.

    Any help or advice would be highly appreciated!