Posted Tue, 09 Jun 2009 15:00:48 GMT by mingo80
Hi, I would like to ask a question: I got drawn-down vs time & recovery vs time database. What I would like to do is put those data file into pumping well which I setup in Feflow (flow boundary)~

Please let me know how to input this data file into well? 


Thanks
Posted Wed, 01 Jul 2009 11:07:39 GMT by Christopherus Braun
The classical method would be to put a well BC with transient pumping rates and compare the measured and calculated drawdowns during the model calibration. Sometimes it is more easy to look only at the recovery period becasue you got then well defined "pumping" conditions.

You must be signed in to post in this forum.