Hi
I want set up a dewatering with 4th well bc model.not allow to use 1st BC. It requires no recharge ( in/out) flow in the model, storage compressibility for each slice is very low. Any suggestion which technique should apply to lower the water level regionally. Currently the abstraction rate is large, the water still not drop down. The water contour shows bull eye around pumping well area.
Ps: multiple well was applied, constraint with proper elevation already.
Thanks