Hi, everyone
I am confused in time control method in simulation process.
For the borehole system, I tried two time control method, one is constant time step method. The simulation could continue until the end of the time, but the results is not good.
I changed to automatic time step control via predictor-corrector scheme , but it could not continue simulate after one day. (I have 600?days to simulate), the time increment could not continue, error is always bigger than the tolerance. (shown in attached documents,), I do not know what happened .
I want to know what is the difference for the results calculated by these two time control method?
one more, I do not know what is the problem when I simulate by the automatic time step, Could some one help me ?
Thank you a lot