Hi All,
I am working on a regional mine dewatering model. There is very little data for the project, therefore we are approaching it as a hypothesis testing project and conducting a coarse sensitivity anlaysis. I am running multiple hydraulic conductivity scenarios using an IFM to vary the K by depth. I am running the model in batch mode to speed up the model and have continuous processing as the model takes 30+ hrs to run. I have the model built and running from the start of the exploration adit to the end of mining, and now want to implement the mining recovery.
If I use time variant material properties to change the K, porosity, and Ss can I have these just applied during the post-mining (recovery) and continue to use the IFM to set the initial material properties? Essentially what I am asking can time variant material properties be applied to only a portion of the simulation time?