HI all,
I assigned 2nd type integral bC to a 3D steady flow model. My understanding is that the flux obtained in Budget Analyzer for the 2nd type BC should be proportional to the integral value I assigned. But it was not. It is very large when I assigned 0.01, and it was very small when I assigned 0.08. In one word, I cannot find a correlation between the value I assigned and the flux provided by the Budget Analyzer. Why is that? I appreciate any reply.

Zheng