Posted Mon, 27 Aug 2007 22:19:08 GMT by ctalbot
I am trying to run an extraction well test simulation using small specified time steps, as small as 0.001 days.  When I export the time histories of head, the time step increments are not what was specified in under temporal and control data (which I imported directly from a text file, and did not edit using the GUI).  Previously with FEFLOW 5.1, the time steps in the head output file change by a extremely small amount (< 0.0000005 days), however these timesteps vary from the specified timesteps by up to 0.01 days.
Posted Wed, 09 Jul 2008 07:24:21 GMT by Boris Lyssenko
Do you find the smaller time steps only in the exported head diagrams, or does your result file (*.dac) also show these time steps as calculated time steps?

You must be signed in to post in this forum.