web
You’re offline. This is a read only version of the page.
close
Please wait...
×

Error



Posted 18 years ago by ctalbot
I am trying to run an extraction well test simulation using small specified time steps, as small as 0.001 days.  When I export the time histories of head, the time step increments are not what was specified in under temporal and control data (which I imported directly from a text file, and did not edit using the GUI).  Previously with FEFLOW 5.1, the time steps in the head output file change by a extremely small amount (< 0.0000005 days), however these timesteps vary from the specified timesteps by up to 0.01 days.
Posted 17 years ago by Boris Lyssenko
Do you find the smaller time steps only in the exported head diagrams, or does your result file (*.dac) also show these time steps as calculated time steps?

You must be signed in to post in this forum.