I would like to run multiple sewer network simulations in batch mode. How is that possible in MIKE+?

Answer
Trick: The quickest mode to run rainfall runoff and hydraulic network simulations in batch mode is by means of the GUI option:

 

#01 - At the MIKE+ GUI, ‘Simulation’ menu you can have access to the “Batch simulation” option - see Fig. 1.

Fig. 1 - Access to Batch Simulations

This launches the Batch Simulation editor which offers the option of running simulation setups in batch mode.

#02 - At the editor - see Fig. 2.

At the editor, simply select the simulations that must be included in the batch. The engine reads the simulation in a top to bottom fashion starting from the ones on top. This is of particular interest when running rainfall runoff results which are planned to be plugged into network or 2D simulations as boundary conditions - see Fig. 2 

Fig. 2 - Batch simulator editor

All simulations are batched in this fashion independently of the engine implemented (MIKE 1D or MIKE21 FM). At the end of your batch a conclusion message will be displayed, including potential errors or simulation fails. 

 